AgendaCue
Sample digest: Sherburne County, MN
Built Nov 28, 2026 from public agendas and staff reports posted in the last 60 days, plus meetings coming up. Every item links to its source document.

What we read: Sherburne County Board, Sherburne County Planning Advisory Commission, and the City of Elk River. Big Lake, Becker and Zimmerman are not in this sample. Sherburne was picked over Carver because its county and largest city agendas were fully readable this week.

Suppliers cut

For lumber yards, building supply and ready-mix. New lots, units and buildings, so your rep can get in early.

1. Oakwater Ridge 2nd Addition
Where: Elk River, near Highway 10 and 165th Ave
Developer or applicant: Capstone Homes
Engineer: Not named in the staff report
Size: 62 single-family lots, 50 to 100 feet wide. The 1st Addition had 89 lots.
Stage: Final plat and development contract. Public improvements start spring 2027.
Meeting: Elk River City Council consent agenda, Nov 16, 2026
Why it matters: 62 more Capstone houses starting in 2027. Lumber, trusses, windows and concrete for the whole addition.
Source
2. Bradford Park Third Addition
Where: Elk River
Developer or applicant: Developer not named in the agenda summary
Engineer: Not named
Size: Lot count not shown in the agenda item
Stage: Development agreement (final plat approved July 6, 2026)
Meeting: Elk River City Council, Oct 19, 2026
Why it matters: The final step before construction. Lots should hit the market soon.
Source
3. Ranch Rd rural lot subdivision
Where: Elk River, 14045 Ranch Rd NW, about 55 acres
Developer or applicant: Landform Professional Services, LLC, on behalf of Marshall Jordi
Engineer: Landform Professional Services
Size: 4 new buildable single-family lots (plus the existing home)
Stage: Preliminary and final plat, public hearing
Meeting: Elk River City Council, Oct 19, 2026
Why it matters: Four large rural home sites going to family members. Custom builds with full basements.
Source
4. River Meadows PUD concept
Where: Elk River, 18925 Cleveland St NW
Developer or applicant: Kent Roessler
Engineer: Not named on the agenda
Size: Not shown on the agenda (concept review)
Stage: Concept review at work session
Meeting: Elk River Planning Commission, Nov 24, 2026
Why it matters: A concept review is the earliest public look at a new neighborhood. Get on the developer's radar now.
Source
5. Good Shepherd Lutheran High School
Where: Elk River, 19122 Freeport St NW
Developer or applicant: Good Shepherd Lutheran High School
Engineer: Not named on the agenda
Size: Educational use CUP. Building scope not shown on the agenda.
Stage: CUP public hearing
Meeting: Elk River Planning Commission, Nov 24, 2026
Why it matters: A school use in an existing or new building often means remodel and site work.
Source
6. Enviro-Chem recycling processing center
Where: Elk River, 19178 Industrial Blvd NW
Developer or applicant: Enviro-Chem
Engineer: Not named on the agenda
Size: Not shown on the agenda
Stage: CUP public hearing
Meeting: Elk River Planning Commission, Nov 24, 2026
Why it matters: An industrial user expanding in Elk River's industrial park. Possible slab and site concrete.
Source
7. Land guided from Neighborhood Commercial to Industrial
Where: Elk River, eight parcels (75-00129-4101, 75-00128-3203 and others), plus one to Highway Business
Developer or applicant: City of Elk River
Engineer: Not applicable
Size: Land use map change
Stage: Public hearing, Resolution 26-76
Meeting: Elk River City Council, Nov 16, 2026 (Planning Commission Oct 27)
Why it matters: New industrial land usually draws new buildings within a year or two.
Source
8. The Preserve at Pine Meadows
Where: Orrock Township, 15875 255th Ave NW, Big Lake, 39.75 acres
Developer or applicant: David Jurek (owners Matthew and April Bischoff)
Engineer: Not named on the agenda
Size: 3 residential lots
Stage: Preliminary and final minor plat
Meeting: Sherburne Planning Advisory Commission Oct 15. County Board Nov 3, 2026.
Why it matters: Three rural home sites, approved and ready for builders.
Source 1 · Source 2

Site and public works cut

For excavating, utility and paving firms. Street, utility, park and site jobs, months before they bid.

1. CSAH 33 and CSAH 13 reconstruction
Where: CR 33 from Hwy 169 to CR 13, and CR 13 from 400 ft north to 1,500 ft south of CR 34
Developer or applicant: Sherburne County Public Works
Engineer: County Engineer
Size: Lowest responsive bid $10,479,198.70 (New Look Contracting, Inc.) against an engineer's estimate of $12,907,074.10
Stage: Lowest responsive bidder approved (SP 071-633-002 / 071-613-013)
Meeting: Sherburne County Board, Nov 17, 2026
Why it matters: A $10.5 million road job just awarded. Subs and suppliers should call the prime before the 2027 season.
Source 1 · Source 2
2. CSAH 16 Bridge #71511 replacement
Where: Sherburne County, CSAH 16
Developer or applicant: Sherburne County Public Works
Engineer: Design and construction phase services approved Oct 6
Size: Bridge replacement (SAP 071-616-019)
Stage: Lowest responsive bidder on the consent agenda
Meeting: Sherburne County Board, Tue Dec 1, 2026 (upcoming)
Why it matters: Award comes Tuesday. Excavation, aggregate, rebar and ready-mix subs should reach the low bidder this week.
Source 1 · Source 2
3. CSAH 16 improvement and County Road 94 reconstruction, right of way
Where: CSAH 16 and County Road 94
Developer or applicant: Sherburne County Public Works
Engineer: Not named on the agendas
Size: Property acquisition for both projects (eminent domain if needed for CR 94)
Stage: Right-of-way resolutions
Meeting: Sherburne County Board Nov 17 (CSAH 16) and Dec 1, 2026 (CR 94)
Why it matters: Right of way comes right before final design and bidding. Both roads are on their way to a letting.
Source 1 · Source 2
4. County Road 45 improvements, CR 4 to CR 9
Where: Zimmerman, Livonia Township and Baldwin Township
Developer or applicant: Sherburne County
Engineer: Not named on the agenda
Size: Roadway surface improvements and a shared-use path. Local news puts it at 4 miles and $2,684,000.
Stage: Resolution sponsoring an LRIP grant application
Meeting: Sherburne County Board, Nov 17, 2026
Why it matters: A $2.7 million road and trail project at the grant stage. Watch for funding in 2027.
Source 1 · Source 2
5. 253rd Ave NW reconstruction and Becker CSAH 23 trail
Where: 253rd Ave NW (township road). Becker, CSAH 23 trail.
Developer or applicant: Township (253rd Ave) and City of Becker (CSAH 23 trail)
Engineer: Not named on the agenda
Size: Grant applications
Stage: County resolutions of support
Meeting: Sherburne County Board, Dec 1, 2026 (upcoming)
Why it matters: Two more paving jobs at the grant stage.
Source
6. US 169 / CSAH 4 interchange
Where: Sherburne County, US 169 at CSAH 4
Developer or applicant: Sherburne County
Engineer: Bolton & Menk (construction services, Amendment 2)
Size: Interchange project
Stage: Construction services amendment approved
Meeting: Sherburne County Board, Nov 3, 2026
Why it matters: A major interchange moving through construction. A steady source of sub and material work.
Source 1 · Source 2
7. County Road 44 reconstruction
Where: Elk River area, County Road 44
Developer or applicant: Sherburne County with Elk River Municipal Utilities (ERMU)
Engineer: Not named on the agenda
Size: Reconstruction with utility coordination
Stage: Agreement with ERMU
Meeting: Sherburne County Board, Oct 20, 2026
Why it matters: Utility relocation plus road reconstruction. Good for utility and excavating contractors.
Source
8. Elk River Downtown Reconstruction, Phase 2
Where: Elk River downtown, including a Main St / Lowell Ave mini roundabout concept
Developer or applicant: City of Elk River
Engineer: Not named on the agenda
Size: Concepts and costs presented. LRIP grant application (Resolution 26-70).
Stage: LRIP application and work session
Meeting: Elk River City Council, Nov 2, 2026
Why it matters: Full downtown street and utility reconstruction in the pipeline.
Source
9. TH 10 and 165th Ave intersection
Where: Elk River, Highway 10 at 165th Ave
Developer or applicant: City of Elk River (partnered with Capstone Homes)
Engineer: Not named on the agenda
Size: Intersection improvement
Stage: Bids approved
Meeting: Elk River City Council, Oct 5, 2026
Why it matters: Awarded and finishing this fall. It opens up the Oakwater Ridge area for more building.
Source
10. Tiller Corporation sand and gravel mine
Where: Livonia Township, 143 acres near Rice Lake
Developer or applicant: Tiller Corporation (owners Capital Land Group, LLC and Elk River Landfill, Inc.)
Engineer: Not named on the agenda
Size: 143-acre sand and gravel mining operation
Stage: Interim Use Permit. County Board expected Dec 15, 2026.
Meeting: Sherburne Planning Advisory Commission, Nov 19, 2026
Why it matters: New aggregate supply in the county. It matters for ready-mix and paving bid pricing.
Source
11. Tulaby Garden 5 MW solar farm
Where: Big Lake Township, 80 acres
Developer or applicant: Tulaby Garden LLC (owner James W Sanford-ETAL)
Engineer: Not named on the agenda
Size: 5 MW solar farm
Stage: Interim Use Permit and comp plan amendment
Meeting: Sherburne County Board, Nov 17, 2026
Why it matters: Solar sites need grading, access roads, fencing and trenching.
Source
Want this every week for your county? $39/month per county, or $29/month at the founding price for the first 20 members (locked for 12 months). Any 3 counties are $79/month and all 6 are $129/month. Month to month. Cancel any time, no contract.
Sign up at agendacue.com or just reply to the email.